Service

Bathroom Renovation

Phillip and Julia had been searching high and low for a tiler to do their bathroom. We jumped at the chance to give them their dream bathroom. They picked out the tiles. We levelled out the walls for the shower enclosure, then tiled the walls and floor.

  • Date: August 2018
  • Location: Gilsland
  • Cost: 500£ – 700£ (labour)
  • Duration: 5-7 weeks
  • Category: Tiling, Plasterboarding and Studwork